The implemented projects of the company include

Finance department projects

  • Supplying and setting up 10,000 1/2-inch to 2-inch meters at the level of Southwest Water Company of Tehran province in 2018
  • The executive operation of installing 10,000 sewer branch lines with a thickness of 110, 125, 160 mm in the city of Karaj and its properties in 1401

Maintenance department projects

  • Implementation of outsourcing of water supply and relief activities and incidents in Ahmedabad, Mostofi and Nowruzabad
  • Outsourcing of all operational and capital activities of Waterfay Wardvard and Tehransar as a second-hand contractor from Motahar Gostar Karun Company
  • Operations, outsourcing and maintenance of water supply activities in Nasim city, Emdad city and events
  • Extension of the second year of the operation operation contract, outsourcing and maintenance of the water supply activities of Nasim Shahr Emdad and events
  • Operation contract, outsourcing and maintenance of Tehransar and Persian Gulf water supply activities in 2015
  • Extension of the third year of the operation operation contract, outsourcing and maintenance of the water supply activities of the city of Nasim, the city of Emdad and events
  • Maintenance operation of heating and cooling facilities of all supply and purification buildings, Hijab and Fatemi
  • Extension of the fourth year of the operation operation contract, outsourcing and maintenance of the water supply activities of Nasim Shahr Emdad and events
  • Operation contract, outsourcing and maintenance of Tehransar and Persian Gulf water supply activities in 2017 along with capital works
  • Operation, repairs and maintenance of all facilities of production sources and… in Chaharbagh and Kamalshahr in 1401

Wastewater sector projects

  • Implementation of a part of the main lines and sewage collection networks in Arak as a second-hand contractor from Sazeh Afrinan Company
  • Implementation of a part of the sewage network piping projects and the construction of the main sewer collector in Zanjan city with double-walled polyethylene pipes in Zanjan as a second-hand contractor from Sazeh Afrinan Company.
  • Implementation of a part of the operation of the sewage collection network of the city of Quds, the sub-lines of the C region, with a polyethylene sewage pipe with a diameter of 200 to 300 mm and a total length of 13290 meters as a second-hand contractor from Mahab Gostar Shamal Engineering Company.
  • Implementation of parts of the contract for the disconnection points of the sewage collection lines and network of Quds city from size 200 to 500 mm as open trenches and sizes 200 and 600 mm as tunnels along with the construction of the necessary manholes as a second-hand contractor from Line and Network Expansion Engineering Company
  • Piping operation for the overflow of 10,000 cubic meters of Bagh Faiz reservoir in University Street, next to Islamshahr Water and Sewerage Department, including the implementation of 500 meters of piping with a 500 mm diameter concrete sewer pipe and a trench depth of up to 3 meters.
  • Piping operation and installation of sewer branches of Vavan environment equipment complex including installation of 200 mm double-walled polyethylene pipes and installation of related sewer branches
  • A part of the executive operation of piping and installation of branches of a part of the sewage network scattered in the 3rd district of Tehran municipality as a second-hand contractor from Arta Akam network company, including the implementation of 800 meters of piping with a diameter of 250 to 400 mm for the development of the network and the installation of 800 sewer branches

Building sector projects

  • Operation of water supply activities in Nasim Shahr city including implementation of 600 concrete sewer line and also 300 concrete sewer line to connect to Nasim Shahr Reservoir No. 1 overflow
  • Pipe laying operations in the form of tunnels and trenches with 1000, 500, 400, and 315 mm size sewage pipes in Qamiyeh Street and Benad Seifi, Islamshahr, along with casing execution with 1500 mm steel pipe in Benad Seifi.
  • Improvement and renovation and removal of defects around, inside, floor and walls of 18 covered wells in Baqershahr
  • The construction of ponds for 21 connections and wells in Golestan city
  • Implementation of the water truss metal bridge structure across the Ken river from the construction credits
  • Construction of ponds and additional works of transmission lines and water distribution network for Mehr Parand housing (first priority)
  • The operation of the water supply activities of Nasim Shahr includes the construction of an administrative-residential building, a pumping station, an electrical room, a chlorination room, a relaxation pond, and major repairs of water tanks and landscaping.

Implementation of the urine reservoir

  • Projects of the reform and development of the water network and branches:
  • Repairing worn-out drinking water branches in Varamin city
  • Installation operation of 1000 water distribution points in the cities of Islamshahr, Vavan, Mianabad
  • Implementation of collection lines from wells to G4 reservoir in Golestan city
  • Implementation of piping operations for well No. 31 and connection to line 1000
  • Implementation of the transmission line of the new well of Hasan Abad Maskan Mehr
  • Piping operation and distribution network and installation of Mehr Kahrizak housing branch
  • Implementation of the Mehr Stratos Vavan water distribution network and transmission line
  • Implementation of the first phase of the piping project on Golhai Boulevard in Tehransar
  • Implementation of the 500 ductile iron pipeline development project in Tehransar
  • Implementation of water collection transmission lines for wells on the side of Azadegan and Fatah highways
  • Implementation of a water transmission line with a diameter of 600 mm in Firuzbehram to supply water to Mehrparand housing
  • Piping and communication and Chinese pond of Bagh Emami lands 55963
  • Modification of branching network of 7th and 9th streets of Tehransar
  • Emergency water supply plan from Al-Ghadir line to Baharestan city
  • Completion of transmission lines and water distribution network of Mehr Parand housing (first priority)
  • Mehr Bazark Rabat Karim Housing Distribution and Branches Network (Abshanasan)
  • Implementation of 700 mm water transmission line in Golestan city
  • Implementation of water collection lines of Mofid town wells and tank 1183
  • Emergency communications and intubation correction of the ligament of Karim
  • The contract for the implementation of line 900 of the Tehran-Saveh highway
  • 9 sections with water connection and connected to Chah Nasim Shahr
  • Implementation of 600 mm piping and connection to both sides of pipe jacking
  • Implementation of the 600 mm line of Azadegan highway
  • Implementation of water distribution network in Nasir Shahr
  • Implementation of the Islamshahr water distribution network in Persian Gulf Boulevard near the ring road
  • Implementation of coating operations and modification and strengthening of inlet and outlet of hydroponic tank
  • The operation of improving the network of Imam Khomeini Street and Ahmedabad Mostofi Branch Alley
  • Implementation of water transmission line in Firouz Bahram treatment plant
  • Piping operation and improvement and development of the water distribution network of Quds city
  • Piping on the western edge of Azadegan highway, under the civil engineering department of Tehran Municipality
  • Piping between reservoir No. 2, Nasim Shahrpark, Fadak, Vajehabad
  • 600 mm drinking water transmission line in Nasim Shahr city
  • Construction of 26 ponds and 20 water connections to Nasim Shahr
  • 350 mm water transmission line, Razi Abad
  • The collection lines of Mehrshahr and compression weights of T Karaj
  • Pipes scattered in the breeze of the city
  • Additional works of transmission line and inspection of Razi Abad reservoir
  • Implementation of sewage transfer line in Islamshahr Qamiyeh and Barand Seifi
  • Implementation of Ahmedabad Mostofi network reform
  • Reservoir network modification 1183 Darya Blvd
  • Implementation of the network and branches of Quds city
  • Modifying the drinking water network is valid
  • Modifying the network and branches of Naseem Shahr
  • Completion of the reservoir between Rahi and Razi Abad and Shahrak Khane
  • Reforming the water distribution network of Islamshahr cities (Vavan, Imam Hossein and Ahmedabad Mostofi towns)
  • Implementation of the improvement of the 3300 meters long Naseem city water distribution network
  • Implementation of installation and diameter change of 3200 branches in Karaj, Rajaeeshahr, Mehrshahr
  • Executive operation of 400 mm Baghstan water transmission line with ductile iron pipes
  • Implementation of operation and moving of 500 and 600 mm pipes of Firouz Bahram treatment plant
  • Implementation of 2165 meters network improvement operation and 400 branches in Mehrshahr
  • Piping with ductile cast iron pipes with a diameter of 500 mm and 300 mm and a length of 1500 meters in Tehransar
  • Saba Shahr and Ferdowsia water transmission line with 500 mm ductile iron pipe 8300 meters long
  • Transmission line with 500 mm ductile iron pipe in Quds city